Fantastic refurbishment at David Lloyd Sudbury

Posted By :
Comments : Off

Sudbury refurbishment was part of the final roll-out for David Lloyd, that required completion pre-Christmas 2014. A short lead into the scheme required careful pre-planning to allow for long lead item’s to dictate the programme phasing.

The scope included the introduction of a new exciting DL Kids area which includes soft play and party rooms. The existing bar area was also completely overhauled to create the new Dlicious bar and lounge area and included a stand-alone Adult Room and Kids IT zones.

On the first floor the existing studio was converted into a new spinning room concept for the club with an additional mind and body studio was installed off the gym. Additional works including the revamp of the entrance reception and desk and external cleaning of the façade with new branded signage.

All the works were carried out in normal hours and over a duration of 8 weeks.